All Issue

2025 Vol.45, Issue 4

Research Article

30 August 2025. pp. 1-15
Abstract
References
1

Park, C. Y., Analysis of Evaluation Methods for Renewable Energy Production in Buildings, Trends in New and Renewable Energy Technology, pp. 19-20, 2011.

2

Korea Energy Agency, 2022 New and Renewable Energy Dissemination Statistics, Ulsan, Republic of Korea, pp. 28-29, 2023.

3

Korea Energy Agency, 2024 KEA Energy Handbook, Ulsan, Republic of Korea, p. 237, 2024.

4

Korea Energy Agency, RPS Comprehensive Support System, 2024. https://rps.energy.or.kr/login.do. last accessed on the 26th March 2025.

5

Ahn, J. W., Proposal for Setting Correction Coefficient of Ocean Temperature Difference as a New Energy Source in the Mandatory Renewable Energy Installation Program, Korea Energy Economics Institute Report, Ulsan, Republic of Korea, p. 82, 2015.

6

Ministry of Land, Infrastructure and Transport, Guidelines for Phase 2 New Town Development in the Capital Region, Sejong, Republic of Korea, 2019.

7

Korea Energy Agency, RPS Comprehensive Support System, 2024. https://rps.energy.or.kr/login.do. last accessed on the 22th January 2025.

8

Lee, G. D. and Lim, D. O., Development and Operation of LCOE Projection System for Long-Term Expansion of Renewable Energy Supply (3/5), Korea Energy Economics Institute, Ulsan, Republic of Korea, p. 25, 2022.

9

Shin, Y. G., Introduction of Geothermal Heat Pump System, Ssangyong Construction Technology, Seoul, Republic of Korea, p. 10, 2011.

10

Korea Energy Agency - New and Renewable Energy Center, Mandatory Installation System for Public Institutions, 2025. https://www.knrec.or.kr/biz/introduce/new_policy/intro_govinstall.do. last accessed on the 14th February 2025.

11

Ministry of Trade, Industry and Energy (MOTIE), The 5th Master Plan for the Development, Utilization, and Dissemination of New and Renewable Energy Technologies, Sejong, Republic of Korea, p. 22, 2020.

12

Ministry of Trade, Industry and Energy (MOTIE), Regulations on the Support for New and Renewable Energy Facilities, Chapter 4, Article 20, Presidential Decree and Notification, Sejong, Republic of Korea, 2020.

Information
  • Publisher :Korean Solar Energy Society
  • Publisher(Ko) :한국태양에너지학회
  • Journal Title :Journal of the Korean Solar Energy Society
  • Journal Title(Ko) :한국태양에너지학회 논문집
  • Volume : 45
  • No :4
  • Pages :1-15
  • Received Date : 2025-04-21
  • Revised Date : 2025-06-16
  • Accepted Date : 2025-07-04